INTRODUCTION
PGCIL was seeking a solution that could enable enhanced power transfer capacity of the existing tower structures. There was no scope for building an additional line due to extreme ROW, with a congested residential corridor and a situation of unrest. The project experienced challenging states of affairs with conductor stringing across Ganges basin, railway line crossing and installing during social unrest in the West Bengal region.