INTRODUCTION

In 2010, the Brazilian Government’s Energy Planning studies pointed out the need for structural works to follow the growth of the market in the state of Rio Grande do Sul.

RELATED CASE STUDIES

Skyrob: Making Opgw Stringing Safe

Project Ganga: Excellence In Project Execution And Product Innovation

Gurgaon Palwal Transmission Limited: India’s First Vertical Substation

SYSTEM AVAILABILITY

Projects DEC 2019 Availability since COD
ENICL 99.82 99.54
BDTCL 99.90 99.71
JTCL 100.00 99.54
RTCL 100.00 99.84
PKTCL 100.00 99.93
NRSS-XXIX 98.61 99.67
MTL 100.00 99.95
OGPTL 100.00 99.95
PTCL 100.00 99.94
KTL 100.00 100.00
GPTL 99.81 99.60