NRSS

INTRODUCTION The State of Jammu & Kashmir is striving to meet the growing power demand, and to address legacy issues such as high peak deficit and lack of electricity access to unconnected households. The state government was looking for an alternate power corridor to light up Kashmir. The old transmission corridor that runs from Moga […]

Farakka Malda

INTRODUCTION PGCIL was seeking a solution that could enable enhanced power transfer capacity of the existing tower structures. There was no scope for building an additional line due to extreme ROW, with a congested residential corridor and a situation of unrest. The project experienced challenging states of affairs with conductor stringing across Ganges basin, railway […]

DMRC

INTRODUCTION The Delhi Metro Rail Corporation limited (DMRC) was looking for solution to connect its INA substation with Dhaula Kuan substation. The two substations needed to be connected to ensure continuous power supply to the metro in the existing congested infrastructure.

SYSTEM AVAILABILITY

Projects DEC 2019 Availability since COD
ENICL 99.82 99.54
BDTCL 99.90 99.71
JTCL 100.00 99.54
RTCL 100.00 99.84
PKTCL 100.00 99.93
NRSS-XXIX 98.61 99.67
MTL 100.00 99.95
OGPTL 100.00 99.95
PTCL 100.00 99.94
KTL 100.00 100.00
GPTL 99.81 99.60

FEEDBACK

    FEEDBACK