NRSS XXIX Transmission Project (NRSS)
The Northern Region Strengthening Scheme (NRSS)-29 is the largest private sector transmission project awarded in the country till date. The project is critical for meeting the power requirements of the state of Jammu & Kashmir. The Kashmir Valley region, besides dealing with socio-economic problems, suffers from blackouts during the harsh winter months. The state currently produces only 800 MW of power and within three years will require almost 4,000 MW of power. Even though it has huge hydropower potential, it must procure power from other states for the foreseeable future. Post commissioning, our project now delivers over 1,000 MW of electricity from Punjab to the Kashmir Valley by strengthening the National Grid.
Novo Estado
This project is the expansion of North-Southeast and North-Northeast interconnections. This is a part of the Belo Monte HPP energy flow solution.
NER-II Transmission Limited (NER-II)
NER-II Transmission Limited (“NER”) was incorporated on April 21, 2015. It entered a TSA (the “NER TSA”) on December 27, 2016. The NER-II project was awarded to Sterlite Power by the Ministry of Power on February 22, 2017 for a 35-year period from the scheduled commercial operation date of the NER-II Project, on a BOOM basis. The project is under development and is expected to be fully commissioned and operational by November 2020.
Marituba
Supply of electric energy to the metropolitan region of Belém and Northeast of the state of Pará.