Sterlite Power doubles transmission capacity of key corridors in Varanasi

Varanasi, 17 September 2018: Sterlite Power has successfully doubled the power capacity on the Gajokhar-Manduadih S/C & Varanasi Cantt -LILO point D/C transmission lines. The uprated transmission lines will transfer 1600 Ampere, up from 700 Ampere earlier, resulting in two-fold increase. The ageing transmission lines were upgraded 2 months ahead of schedule.   Indian railways owned […]

SYSTEM AVAILABILITY

Projects DEC 2019 Availability since COD
ENICL 99.82 99.54
BDTCL 99.90 99.71
JTCL 100.00 99.54
RTCL 100.00 99.84
PKTCL 100.00 99.93
NRSS-XXIX 98.61 99.67
MTL 100.00 99.95
OGPTL 100.00 99.95
PTCL 100.00 99.94
KTL 100.00 100.00
GPTL 99.81 99.60

FEEDBACK