A one-of-its-kind project in Brazil, the Pampa project once completed will be transmitting power of over 1500 MVA.

PROJECT STORY

The Pampa Project has 316 km of transmission line to be built, the implementation of 1 new substation and the expansion of 3 substations in the region to be deployed in the state of Rio Grande do Sul. Power of 1544 MVA.

Project Detail

– LT South 525kV Capivari – Gravataí, C1, with 83 km;

– LT South 230kV Capivari – Viamão 3, C1, with 65 km;

– LT 525kV Guaiba 3 – South Capivari, C1, with 168 km;

– SE 525/230/138 kV South Capivari’s – 525/230 kV – (6 + 1) x 230/138 kV 224 MVA and – 2 x 100 MVA.

TIMELINES

Milestone1 : Preliminary Environmental License

Milestone 2 : Installation Environmental License

PROJECT GALLERY

RELATED LINKS

 MUMBAI URJA MARG LIMITED

GOA TAMNAR TRANSMISSION PROJECT LIMITED

LAKADIA VADODARA TRANSMISSION PROJECT LIMITED (LVTPL)

SYSTEM AVAILABILITY

Projects DEC 2019 Availability since COD
ENICL 99.82 99.54
BDTCL 99.90 99.71
JTCL 100.00 99.54
RTCL 100.00 99.84
PKTCL 100.00 99.93
NRSS-XXIX 98.61 99.67
MTL 100.00 99.95
OGPTL 100.00 99.95
PTCL 100.00 99.94
KTL 100.00 100.00
GPTL 99.81 99.60